At the regulatory level, The last few weeks have been dizzying. To the recent arrival of key figures such as the Independent Aggregator and Flexible Accesses, Now the piece that completed the puzzle is added: the official publication of the Capacity Market in the BOE.
What is the most important thing you need to know as a future participant in this new market? Let's get down to the nitty-gritty of the rules of the game:
To participate, A minimum firm power of 1 MW is required. However, There is a small print: The aggregated portfolios may only be constituted by grouping facilities that, individually, have less than 1 MW. In addition, Apples cannot be mixed with apples; the portfolios must be composed entirely of existing facilities or entirely of «new investments».
The cost of this market will fall directly on the traders and direct consumers. Where is the opportunity? This cost will be concentrated only on the times of highest stress in the system (less than 10% % of the annual hours). Accurately predicting these peaks and shifting demand at the exact moment will be vital to avoid massive overcharges.
Finally, demand and storage will compete on equal terms with traditional generation to provide firmness to the system. This market opens up a new route of recurring revenue through technologically neutral auctions. The counterpart: Red Eléctrica will require millimeter-precise accuracy and reliability when responding to any activation.
At this point, the conclusion is clear. Trying to manage the aggregation of hundreds of assets of less than 1 MW, predict the hours of stress using mathematical models, and ensure an impeccable response to avoid REE penalties is, in practical terms, impossible to do manually.
Technology is needed, and that's exactly where it comes in. Bamboo Energy.
Our optimization and aggregation software acts as the algorithmic brain of marketers, aggregators, and representatives. We take care of absorbing the technical complexity, automating flexibility in real time, and protecting your margins against potential penalties. You focus on growing your business.
The playing field for flexibility in Spain has never been more prepared. If you want to start defining your strategy to enter the Capacity Market, let’s talk.
🔗 Link to the publication in the BOE: https://www.boe.es/diario_boe/txt.php?id=BOE-A-2026-19329